uatro architects
uatro       architects

MADISON COURT ONIRU, LAGOS.

Description of the property

The proposed development is located within the Oniru Chieftaincy Family Residential Estate on Ihuntayi Road. The site is located at Plot 32 Block XIII , Oniru Chieftaincy Family Estate and is easily accessible via a paved access road directly off the Palace Road. Power and ancillary services are available. The site covers a total area of approximately 1,348m2. Quatro Architects is proposing the development of a luxury residential development comprising 7 nos. 4-bedroom luxury townhouse units each with attached boys quarters. The development will be centrally serviced upon completion. Other services included are car parking spaces, bore hole and treatment plant as well as stand by power generators.

 

4 Bedroom townhouses
Ante Room/Lobby/Guest Toilet
Covered Parking for 2 Cars
Large Living / Dining Area
Kitchen/ Store
Family Lounge
Master Bedroom with en-suite toilet and bathroom
3 Bedrooms with en-suite toilet and bathroom
Terraces
Airconditioners installed
Inverters installed (with possibility to upgrade batteries)
1 Room Boysquarters attached

Total Floor Area per Townhouse - 250m2

 

Common services to be shared by all units

Borehole and Water Treatment plant.
Generator house/Stand-by power generators.
Soak away/Septic Tank
Waste Disposal
General Maintenance

 

COMPLETION DATE

Construction work Is To commence in March 2016 with the mobilization to site of the contractors. Construction work is expected to be completed in 15 months by June 2017.


IMPLEMENTATION

The project is to be executed under a turnkey agreement with a reputable construction organization. The estimated construction period is 15 months. Upon commitment, pre-settlement agreements would be signed between all buyers and quatro architects. On completion, a deed of sublease would be executed in favour of the buyer.

ANTHONIOS LEKKI, LAGOS.

Description of the property

The proposed development along a paved road located at Ilasan Village in Elegushi Estate in Lagos state. The site is a One minute drive off the lekki/epe express way. The site covers a total area of approximately 3,000m2. Quatro Architects is proposing the development of a, state of the art Luxury Apartment facility offering 18 Nos. 3-bedroom luxury apartments and 12 Nos. 2-bedroom Luxury apartments. All bedrooms are en-suite. Each of the 3- bedroom apartments includes an attached boys room. The facility will be centrally serviced upon completion. Services included are 3 High Speed Elevators, Swimming Pool, car parking spaces, bore hole and treatment plant as well as stand by power generator.

 

 

 

Spaces                                     Area
2 bedroom apartments 
Lounge/dining                          16m2
Bedroom 1 en suite                  17m2
Bedroom 2 en suite                  14m2
Kitchen                                       7m2
 

 

Spaces                                     Area
3 bedroom apartments 
Lounge/dining                        56m2
Bedroom 1 en suite                19m2
Bedroom 2 en suite                15m2
Bedroom 3 en suite                21m2
Kitchen                                   12m2
Boys quarters                           8m2

 

 

Common services to be shared by all units

Stand by generator
Swimming pool
Car parking spaces
Borehole/treatment
Security
Elevators

 

COMPLETION DATE

Construction work will commence soon with mobilisation to site of contractors.

 

Oak Court Oniru, Lagos.

Description of the property

The proposed development is located between within the Oniru Chieftaincy Family Residential Estate. The site is located at Plot 3 Block XIV , Oniru Chieftaincy Family Estate and is easily accessible via a paved access road directly off the Palace Road. Power and ancillary services are available. The site covers a total area of approximately 1,479m2. Quatro Architects is proposing the development of a luxury residential development comprising 6 nos. 4-bedroom luxury townhouse units each with attached boys quarters. The development will be centrally serviced upon completion. Other services included are car parking spaces, bore hole and treatment plant as well as stand by power generators.

 

4 Bedroom townhouses 
Lobby
Large Living / Dining Area
Kitchen/ Store
Guest Toilet3
Master Bedroom with en-suite toilet and bathroom
3 Bedrooms with en-suite toilet and bathroom
Terraces
Airconditioners installed
Inverters installed (with possibility to upgrade batteries)
1 Room Boysquarters attached

Total Floor Area per Townhouse - 230m2

 

Common services to be shared by all units

Car parking spaces.
Borehole and Water Treatment plant.
Generator house/Standby power generators.
Soak away/Septic Tank
Waste Disposal
General Maintenance

 

COMPLETION DATE

Construction work has commenced with mobilisation to site of contractors.


IMPLEMENTATION

The project is to be executed under a turnkey agreement with a reputable construction organization. The estimated construction period is 12 months. Upon commitment, pre-settlement agreements would be signed between all buyers and quatro architects. On completion, a deed of sublease would be executed in favour of the buyer.

Pinnacle Court Ikoyi, Lagos.

Description Pinnacle Court Property:

The proposed development is located along Lugard Avenue in the old Ikoyi area of Lagos-state. The site is a two minute drive from kingsway Road to the north and second avenue to the south. The site covers a total area of approximately 2,700m2. Quatro Architects is proposing the development of a luxury residential mini-estate 10 nos. 4-bedroom luxury semi-detached duplex units each with attached boys quarters. Each of the units will have private rear and side gardens. The development will be centrally serviced upon completion. Other services included are car parking spaces, a swimming pool, bore hole and treatment plant as well as stand by power generators.

 

4 Bedroom semi-detached Duplexes
Lobby
Large Living / Dining Area
Kitchen/ Store
Guest Toilet
Master Bedroom with en-suite toilet and bathroom
3 Bedrooms with en-suite toilet and bathroom
Terraces
Airconditioners installed
Inverters installed (with possibility to upgrade batteries)
1 Room Boysquarters attached

Total Floor Area per Townhouse  - 230m2

 

Common services to be shared by all units

Car parking spaces.
Swimming Pool.
Borehole and Water Treatment plant.
Generator house/Stand-by power generators.
Soak away/Septic Tank.
Waste Disposal.
General Maintenance.

 

Completion Date

The development is to commence in May 2015 with the mobilization to site of the contractors. Construction work is expected to be completed in 15 months.

 

IMPLEMENTATION

The project is to be executed under a turnkey agreement with a reputable construction organization. The estimated construction period is 15 months. Upon commitment, pre-settlement agreements would be signed between all buyers and quatro architects. On completion, a deed of sublease would be executed in favour of the buyer.

Corviale Court, LEKKI Lagos.

Description of the property

 

The proposed development is located along the recently paved kusenla road in lekki. The road is located directly off the lekki-epe express-way at the 4th roundabout. The site is a one minute drive off the lekki expressway making it easily accessible. Power and ancillary services are availale. The site covers a total area of approximately 1,000m2. Quatro Architects is proposing the development of a luxury residential development comprising 4 nos. 4-bedroom luxury townhouse units each on three levels, with attached boys quarters and a 2 bedroom penthouse apartment on the last floor. The development will be centrally serviced upon completion. Other services included are car parking spaces, bore hole and treatment plant as well as stand by power generator.

 

4 Bedroom townhouses

Lobby

Large Living / Dining Area

Kitchen/ Store

Guest Toilet

Master Bedroom with en-suite toilet and bathroom

3 Bedrooms with en-suite toilet and bathroom

Terraces Inverters installed (with possibility to upgrade batteries)

1 Room Boysquarters attached

        Total Floor Area per Townhouse  - 200m2

 

 

Common services to be shared by all units

2 nos. Car parking spaces per unit.

Borehole and Water Treatment plant.

Generator house/Stand-by power generator.

Soak away/Septic Tank

Waste Disposal

General Maintenance 

 

Completion Date

The development is to commence in May 2015 with the mobilization to site of the contractors. Construction work is expected to be completed in 12 months, May 2016.

 

IMPLEMENTATION

The project is to be executed under a turnkey agreement with a reputable construction organization. The estimated construction period is 12 months. Upon commitment, pre-settlement agreements would be signed between all buyers and quatro architects. On completion, a deed of sublease would be executed in favour of the buyer.

Print Print | Sitemap
©Copyright 2000-2018. Quatro-Architects Lagos. All rights reserved.